Practice Highlights

  • Tatiana Bilbao Exhibition for NGV (2022), Design Consultation & Fabrication, National Gallery of Victoria & Tatiana Bilbao Estudio

  • Museum of Play & Art (2021), Design & Fabrication of Exhibit Infrastructure / Sculpture, MOPA

  • Heide MOMA Sculpture Garden Didactics (2021), Design Consultation & Fabrication, Heide MOMA

  • Heide Healing Garden (2021), Rest Spaces and Plant Frames, Openwork & Heide MOMA

  • Glencairn (2020), Architectural Models and Entryway Fabrication, Trower Falvo Architects

  • Cocoon Play Equipment & Accessible Wicker Beds (2019), Design Consultation & Fabrication, Pollen Studio

  • The Venny Playground (2018-Present), Mentorship & Fabrication, The Venny

  • Siteworks (2016-Present), Infrastructuring & Fabrication, These Are The Projects We Do Together

  • M Pavilion (2015), Architectural Model, Sean Godsell

  • Testing Grounds Phase 2 (2016-2019), Architectural Models & Consultation, These Are The Projects We Do Together

  • Utility Kinetic Intersect (UKI) (2018), Detail Fabrication, Callan Morgan

  • The Projects Quarry (2016-Present), Infrastructuring, Architectural Models, Prototyping, These Are The Projects We Do Together

  • Testing Grounds Phase 1 (2013-2016), Container Customisation & Fabrication, These Are The Projects We Do Together

  • Infinitarium (2010), Fabrication & Installation, American Steel Studios (Oakland, CA)

Employment History

  • Founder (2014-Present), Dale Holden Studio

  • Lead Fabricator (2013-2014), Lump Sculpture Studio

  • Sheet Metal Fabricator (2012-2013), Henlor Sheet Metal

  • Fabricator, Artspace Handler (2009-2012), American Steel Studios (Oakland, CA)

Academic History

  • Bachelor of Design (2003-2006), Queensland College of Art (incomplete)

  • Diploma Of Multimedia (2001), QANTM